# **TotalEnergies Uganda: Expression of Interest (EOI) for EPC of 2 (20MW) Solar PV Plants**
## **Introduction**
TotalEnergies EP Uganda, a leading multi-energy operator, invites experienced and reputable contractors to express their interest in providing **Engineering, Procurement, and Construction (EPC)** services for a turnkey project. This project involves the development of **two (2) 20MW ground-mounted solar photovoltaic (PV) plants** in the **Iganga and Tororo districts of Uganda**.
This **Expression of Interest (EOI)** is aimed at assessing market capability and identifying potential bidders for a future **Call for Tender (CFT)**. Please note that this EOI is for market exploration and does not constitute a contractual commitment.
## **Scope of Work**
### **1. Engineering, Procurement & Construction (EPC)**
The EPC scope includes:
- **Project Management & Engineering**
- **Procurement & Supply** of PV modules, Balance of System (BOS) equipment, substations, and overhead lines
- **Construction & Installation** of infrastructure and equipment
- **Testing, Commissioning & Performance Warranty**
### **2. Operations & Maintenance (O&M)**
- **Standard O&M Services** for the first two years post-commissioning (with termination rights after two years)
- **Optional O&M Service** with an initial 10-year term (termination allowed after five years, with a possible 10-year extension)
## **Detailed EPC Scope**
### **A) Project Management**
- Project oversight and site supervision
- Quality control and compliance
- Health, Safety, Security, Social & Environmental (H3SE) Management
### **B) Engineering & Documentation**
- Project design and engineering
- Procurement and construction documentation
- Certificates and factory acceptance testing
- Commissioning and testing documentation
### **C) Permitting & Regulatory Compliance**
The contractor must obtain all necessary authorizations and permits from Ugandan authorities, including but not limited to:
- Land/property access permits
- Development and building permits
- Environmental permits (waste disposal, water abstraction, effluent discharge, etc.)
- Worksite registration and safety compliance
### **D) Procurement**
The contractor will be responsible for procuring the following key components:
- PV Modules & Mounting Structures
- Inverters & Control Systems
- Meteorological Stations
- Cabling, Step-up Transformers, and Overhead Lines
- Fences, Gates & Spare Parts
### **E) Construction & Installation**
- Civil works, logistics, and infrastructure setup
- Electrical and mechanical installations
- System commissioning and interconnection
- Cleaning, waste management, and site maintenance before provisional acceptance
## **Eligibility Criteria & Financial Requirements**
### **1. Mandatory Registration**
- Current or pending registration with Uganda’s **National Supplier Database (NSD)** as per the **2016 Upstream Petroleum Regulations**
### **2. Financial Stability**
- Submission of **audited financial statements** for the last **five years (2019-2023)**
- **Liquidity Ratio:** Current Assets / Current Liabilities ≥ 1
- **Debt Ratio:** (Total Liabilities / Total Assets) ≤ 80%
- **Average Annual Turnover:** At least **USD 50 million**
### **3. Experience & Technical Expertise**
- At least **three (3) contracts** for the **design and construction** of **10MW+ PV power plants**
- At least **one (1) contract** for **PV plant operation & maintenance** for a large-scale PV plant
- At least **two (2) contracts** for the **design and construction of 132kV (or higher) substations** in Sub-Saharan Africa
### **4. National Content Compliance**
- Commitment to **Uganda’s National Content Requirements** under the 2016 Petroleum Regulations
- Employment, training, and skills transfer for Ugandan workers
- Utilization of **locally available goods and services**
## **Submission Guidelines**
### **How to Apply**
Interested contractors meeting the eligibility criteria must:
1. **Submit their Expression of Interest (EOI) via email** at **ren_uganda@totalenergies.com**
2. **Request the annex table of required deliverables** and submit it before the deadline
3. Ensure that the application is **complete**—incomplete applications will not be considered
### **EOI Submission Deadline**
- **Date:** February 28, 2025
- **Time:** **Noon Kampala Time (GMT+3)**
- **Email Subject:** *EXPRESSION OF INTEREST (EOI) FOR EPC OF A TURNKEY PROJECT FOR 2 (20MW) GROUND-MOUNTED SOLAR PHOTOVOLTAIC PLANTS REFERENCE 10400040*
## **Next Steps**
Only the **highest-ranked contractors**—those meeting all financial, technical, and regulatory requirements—will be **invited to submit bids** in the formal **Call for Tender (CFT)** process.
For additional details, interested parties should **submit their EOI well in advance of the deadline** to ensure compliance and avoid last-minute issues.
## **Conclusion**
This project represents a significant opportunity for contractors specializing in **solar energy infrastructure, EPC services, and O&M for large-scale PV power plants**. If your company has the required expertise and financial capacity, we encourage you to **submit your EOI before the deadline** and become part of Uganda’s **sustainable energy transition with TotalEnergies**.
For inquiries and submission, contact:
📩 **ren_uganda@totalenergies.com**
---